Can people be measured? Performance and disabled
employees.
3rd
International Conference on Value Chain Sustainability –
ICOVACS 2010, Valencia-SPAIN, 2010
Alternative
tools to mass production and human
Performance Indicators in Sheltered Work
Centers of Valencian
Community
(Spain).
3rd
International Conference on Value Chain Sustainability –
ICOVACS 2010, Valencia-SPAIN,
2010
The potential of Pokayokes for Universal Design
in
the workplace: a case study.
3rd
International Conference on Value Chain
Sustainability – ICOVACS 2010, Valencia-SPAIN,
2010
Extensão
do problema ALWABP: melhorando a
flexibilidade a través de estações
paralelas.
XLII Simposio Brasilero de Pesquisa Operacional, Bento
Gonçalves-BRAZIL, 2010
Revisión
teórica del modelo de implantación del TPM
y análisis de líneas de investigación
futuras.
5th
International Conference on Production Research. ICPR AMERICAS 2010,
Bogotá-COLOMBIA,
2010
Relationship between Lean Manufacturing and High
Involvement Work Practices and perceived results.
5th
International Conference on Production Research. ICPR AMERICAS 2010,
Bogotá-COLOMBIA,
2010
Efecto
de la organización del trabajo en la satisfacción
de los empleados del sector servicios de Cataluña.
5th
International Conference on Production Research. ICPR AMERICAS 2010,
Bogotá-COLOMBIA,
2010
Balanceando
linhas de produção com trabalhadores
deficientes e estações paralelas.
5th
International Conference on Production Research. ICPR AMERICAS 2010,
Bogotá-COLOMBIA,
2010
Beam
Search procedure for the Assembly Line Worker
Assignment and Balancing Problem.
5th
International Conference on Production Research. ICPR AMERICAS 2010,
Bogotá-COLOMBIA,
2010
Efecto de las
prácticas de producción ajustada
sobre los resultados no financieros: estudio empírico en
Centros Especiales de
Empleo españoles.
5th
International Conference on Production Research. ICPR AMERICAS 2010, Bogotá-COLOMBIA,
2010
Humanitarian
logistics and hubs’ location – vehicles’
routing problem: a case study in
bolivia.
9th International Conference on Health
Economics, Management
and Policy, Athens-GREECE, 2010
Problema
de balanceamento e designaçao de
trabalhadores em linha de Produçao: Uma abordagem via o m
étodo híbrido busca por agrupamentos (CS).
XLI Simposio Brasilero de Pesquisa
Operacional, Porto Seguro-BRAZIL, 2009
Análise
da eficiência de linhas de produção com
trabalhadores deficientes.
XLI Simposio Brasilero de Pesquisa Operacional, Porto Seguro-BRAZIL,
2009
Performance Management in Sheltered Work centres
for Disabled.
III
International Conference on Industrial Engineering and Industrial
Management, Barcelona-SPAIN, 2009
Diagnóstico del nivel de
implantación de herramientas
de Ingeniería de Organización para la
gestión de
Centros Especiales de Empleo españoles.
International
Conference on Industrial Engineering and Industrial Management, Barcelona-SPAIN, 2008
La
Ingeniería de Organización
en un entorno educativo globalizado: reflexiones y propuestas para la
universidad española.
II International
Conference on Industrial Engineering and Industrial Management,
Burgos-SPAIN,
2008
El grado de uso de las dinámicas
para apoyo del
trabajo en grupo de estudiantes universitarios de Ingeniería.
II
International
Conference on Industrial Engineering and Industrial
Management, Burgos-SPAIN, 2008
¿Algo
más práctico que una
buena teoría? El efecto de las recomendaciones
teóricas en el éxito de implantación
de un programa de Mejora Contínua.
II
International
Conference on Industrial Engineering and Industrial Management, Burgos-SPAIN, 2008
Evaluación
del uso de
herramientas de Ingeniería de Organización para
la gestión de Centros Especiales
de Empleo.
II International Conference on Industrial
Engineering and Industrial Management, Burgos-SPAIN,
2008
Responsabilidad Social de las universidades:
cómo
responder a las necesidades de los grupos de interés en la
titulación de Ingeniería
de Organización Industrial en el marco del EEES.
II International Conference on Industrial
Engineering and Industrial Management, Burgos-SPAIN,2008
Logística inversa: impacto ambiental y económico
en
la gestión de la cadena de suministro
II International Conference on Industrial
Engineering and Industrial Management, Burgos-SPAIN, 2008
Uma metaheurística
híbrida aplicada
ao problema de balanceamento e designação de
trabalhadores em linha de produção
XL
Simposio Brasilero de Pesquisa Operacional, João
Pessoa-BRAZIL, 2008
Rotação de tarefas em linhas de
produção com
trabalhadores deficientes
XL Simposio Brasilero de Pesquisa
Operacional, João Pessoa-BRAZIL, 2008
Integrating people with disabilities into work
through OR/MS tools: an applied vision
3rd
International Conference on Human Centered
Processes – Workshop on OR & Ethics, Delft-NETHERLANDS,
2008
An application oriented approach for scheduling a
production line with two dimension setups
11th
International Workshop on Project Management
and Scheduling -
PMS 2008, Instanbul-TURKEY, 2008
Clustering search approach for the Asembly Line Worker Assignment and
Balancing Problem
37th International Conference on Computers and
Industrial Engineering, Alexandria-EGYPT, 2007
Evaluation of
performance indicators for Sheltered WorkCentres for Disabled
37th International Conference on Computers and
Industrial Engineering, Alexandria-EGYPT, 2007
Secuenciación
en procesos cíclicos de pintura. Modelos y heuristicas
XXX Congreso Nacional de Estadística e
Investigación Operativa, Valladolid-SPAIN, 2007
La
integración laboral de las personas con discapacidades como
parte de la RSC de las empresas
1st International
Conference on Industrial Engineering and Industrial Management,
Madrid-SPAIN, 2007
El Libro Blanco de
la RSE en España: la gestión de empresas desde la
Responsabilidad Social
1st International
Conference on Industrial Engineering and Industrial Management,
Madrid-SPAIN, 2007
La
relación entre el aprendizaje interno y las
prácticas de producción en el sector azulejero.
Una visión desde la teoría de recursos y
capacidades
1st International Conference on Industrial
Engineering and Industrial Management, Madrid-SPAIN, 2007
Mejora de los
resultados operativos de una línea de
fabricación: efecto de diversas variables en el
éxito de kaizen-blitz en proveedores de fabricantes de
automóviles
1st International
Conference on Industrial Engineering and Industrial Management,
Madrid-SPAIN, 2007
Análisis
y rediseño de puestos de trabajo. Adaptación del
cuestionario español del Job Diagnostic Survey al puesto de
trabajo de los estudiantes universitarios
1st International
Conference on Industrial Engineering and Industrial Management,
Madrid-SPAIN, 2007
A decision support
system for a painting facility in an automotive supplier
3rd MISTA
Multidisciplinay International Conference on Scheduling: Theory and
Applications, Paris-FRANCE, 2007
Group versus
individual suggestions systems: a longitudinal case study
19th ICPR
International Conference on Production Research, Valparaiso-CHILE, 2007
An heuristic
planning algorithm for the discrete manufacturing industry with reverse
BoM and alternative structures
19th ICPR
International Conference on Production Research, Valparaiso-CHILE, 2007
Socio-labour
integration of disabled as part of CSR
22nd European
Conference on Operational Research, EUROXXII - Prague-CZECH REPUBLIC,
2007
Batch cyclic
scheduling with setups in an Automobile Sector Supplier. A case study
XIII Congreso
Latino_Iberoamericano de Investigacion Operativa, Montevideo-URUGUAY,
2006
Balancing
assembly lines with sequence dependent setup times between tasks: IP
model and GRASP algorithm for a new problem
21st European
Conference on Operational Research EURO, Reykiavik-ISLAND, 2006
Scheduling in
an Automobile Supplier. Models and heuristics.
21st European
Conference on Operational Research EURO, Reykiavik-ISLAND, 2006
Equilibrado de
lineas con setup. Un modelo matemático
XIX Congreso Nacional
de Estadística e Investigación Operativa,
Tenerife-SPAIN, 2006
A path
relinking procedure for balancing assembly lines with setups
The Sixth
Metaheuristics International Conference (MIC'05), Viena-AUSTRIA, 2005
Application of
U-Lines principles to the Assembly Line Worker Assignment and Balancing
Problem (UALWABP). A model and a solving procedure
Operational Research
Peripatetic Postgraduate Programme International Conference ORP3,
Valencia-SPAIN, 2005
Revisión
de la relación entre el plan agregado y el plan maestro.
IX Congreso de
Ingeniería de Organización CIO 2005,
Gijón-SPAIN, 2005
Diseño
de puestos de trabajo en líneas de montaje de Centros
Especiales de Empleo bajo criterios de Diseño Universal:
antecedentes y aplicación.
IX Congreso de
Ingeniería de Organización CIO 2005,
Gijón-SPAIN, 2005
Advantages of
assembly lines in Sheltered WorkCentres for Disabled. A case study.
18th ICPR
International Conference on Production Research, Salerno-ITALY, 2005
Solving
procedures for the Assembly Line Worker Assignment and Balancing
Problem. Application to Sheltered Work Centres for Disabled
Escuela
Latinoamericana de Verano en Investigación Operativa ELAVIO,
Villadeleyba-COLOMBIA, 2005
A
Multiobjective Genetic Algorithm to solve the scheduling problem in
flowshops with sequence dependent setup times
International
Conference on Industrial Engineering and Systems Management -
Marrakech-MORROCO, 2005
Modelos
para el problema de equilibrado y asignación de puestos en
líneas con tiempos dependientes del operario.
Aplicación en Centro Especial de Empleo
XXVIII Congreso
Nacional de Estadística e Investigación
Operativa, Cadiz-SPAIN, 2004
Procedimientos
de resolución para el problema de equilibrado y
asignación de puestos en líneas con tiempos
dependientes del operario.
XXVIII Congreso
Nacional de Estadística e Investigación
Operativa, Cadiz-SPAIN, 2004
Revisión
periódica en tiendas con un elevado número de
referencias de lento movimiento
Congreso de Ingeniería de
Organización CIO 2005, Leganés-SPAIN, 2004
Un modelo de
referencia para el incremento de la accesibilidad en centros especiales
de empleo a través del uso de herramientas de
Organización
Industrial
Congreso de Ingeniería de
Organización CIO 2005, Leganés-SPAIN, 2004
Branch and
Bound procedures for solving the Assembly Line Worker Assignment and
Balancing Problem
International CO 2004
Combinatorial Optimisation Conference, Lancaster - UK, 2004
ERP
Implementation in the stone industry: special difficulties and
solutions in the production area
IEEE Conference on
Emerging Technologies and Factory Automation ETFA, Lisbon-PORTUGAL, 2003
Aplicación
de técnicas de Factoría Visual y 5S a Centros
Especiales de Empleo para personas discapacitadas.
V Congreso de
Ingeniería de Organización CIO 2003 -
Valladolid-SPAIN, 2003
Procedimientos
de resolución para el equilibrado de líneas de
montaje considerando variables los tiempos de operación.
Aplicación en Centros Especiales de Empleo.
V Congreso de
Ingeniería de Organización CIO 2003 -
Valladolid-SPAIN, 2003
Planificación
de la producción en entornos complejos con listas de
materiales invertidas y estructuras alternativas.
V Congreso de
Ingeniería de Organización CIO 2003 -
Valladolid-SPAIN, 2003
The line
balancing problem with variable operation times &
worker’s abilities
I Joint International
Conference EUROMA&POMS, Cernobio-ITALY, 2003
Equilibrado de
líneas de montaje considerando variables los tiempos de
operación y habilidades de los operarios.
XXVII Congreso
Nacional de Estadística e Investigación Operativa
- Lleida-SPAIN, 2003
Production
Planning in a Automotive Press Shop. A model and a Resolution Procedure
Eighth International
Workshop on Project Management and Scheduling, Valencia-SPAIN, 2002
La ingenieria
de Organizacion Industrial y el empleo de las personas con discapacidad
III Congreso Nacional
de Centros Especiales de Empleo de España, Valencia-SPAIN,
2002
Análisis
del sistema decisión al en una empresa de montaje de
automóviles. Aplicación de la
Metodología GRAI
II Conferencia de
Ingeniería de Organización CIO 2002 - Vigo-SPAIN,
2002
Desarrollo de
una metodología para el Diseño,
Análisis y Valoración de puestos de trabajo para
su desempeño por personas discapacitadas.
II Conferencia de
Ingeniería de Organización CIO 2002, Vigo-SPAIN,
2002
La
Ingeniería de Organización Industrial y el empleo
de las personas con discapacidad.
III Congreso Nacional
de Centros Especiales de Empleo de España, Valencia-SPAIN,
2002
Programación
de producción en grandes series con líneas en
paralelo y restricciones comunes.Una
aproximación operativa y otra táctica
IV Congreso de
Ingeniería de Organización CIO 2001,
Sevilla-SPAIN, 2001
La
Programación de la Producción en el sector del
automóvil. El problema de la Segmentación
IV Congreso de
Ingeniería de Organización CIO 2001,
Sevilla-SPAIN, 2001
Aspectos
operativos para la gestión de stocks por punto de pedido en
sistemas de fabricación con demanda estable
XXVI Congreso
Nacional de Estadística e Investigación
Operativa, Úbeda-SPAIN, 2001
A graphic
interface for an application in the Environment of the Supply Chain
management
I World Conference on
Production and Operations Management POMS, Sevilla-SPAIN, 2000
|